Level 1 occurs along a sloped street with a 6-foot total drop from east to west.All work in the architectural, structural and MEP models is in the New Construction phase.Sweeps and custom families are used to model many of the masonry features. The façades model uses custom fill patterns to represent the existing historical bricks utilized in the existing buildings.Phasing is used in the façades model to differential the existing to remain and demolition of the building elements from the point cloud.A point cloud file was the basis for the façades model.HVAC systems use equipment, ducts, pipes and spaces. Plumbing fixtures, piping, roof drains, sanitary, domestic water and other systems are featured. MEP: Electrical fixtures, equipment and conduits are all featured.Structurally both steel and concrete systems are showcased.Architecturally this includes Walls, Doors, Windows, Floors, Ceilings, Roofs, Columns, Fixtures, Stairs, Railings, Ramps, Furniture, Equipment, Rooms, Site items, Sweeps and Shafts.Model uses most of the standard toolsets. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |